# What is an enterprise data centre? — Cyber Security and Resilience Bill

> An enterprise data centre is one an organisation runs for its own IT. Under the Cyber Security and Resilience Bill (CSRB), the test is stricter: its sole purpose must be providing IT services for the undertaking that owns or manages it. Those sites would be regulated at 10 megawatts, rather than the usual 1 megawatt.

Canonical page: https://cybersecurityandresiliencebill.com/guides/what-is-an-enterprise-data-centre
Updated: 2026-11-09

Status checked 13 November 2026: the Bill passed the House of Lords on 2 November 2026 and returns to the Commons, which is due to consider the Lords amendments on 24 November 2026. On 4 November 2026 the Commons extended its carry-over, so it lapses if not passed by the end of 29 April 2027. It is not yet law. References are to HL Bill 62 (as amended on Report), so wording and numbering may still change in the final Act. This guide is general information, not legal advice.

## Key points

- Under the Bill, a data centre is enterprise only if its sole purpose is IT services for the business that owns or manages it.
- Enterprise sites would be regulated at 10 MW of rated IT load; all others at 1 MW.
- Rated IT load means maximum power available for IT equipment, not average consumption.
- Hosting even one outside customer could move a site to the 1 MW threshold.
- Record your reasoning per site and review it when tenants, capacity or ownership change.

## What does "enterprise data centre" mean?

In everyday industry use, an enterprise data centre is a facility an organisation runs for its own IT, as opposed to a colocation site that rents space to many customers or a hyperscale cloud campus. The phrase is sometimes used more loosely for any high-specification, "enterprise-class" facility.

The Cyber Security and Resilience Bill (CSRB) gives it a narrower legal meaning, and that meaning decides whether a site is regulated at 1 megawatt or at 10 megawatts.

## What is the legal test?

Under new paragraph 11(7) of [Schedule 2](/guides/schedule-2-thresholds) to the NIS Regulations, inserted by clause 4 of HL Bill 62 (as amended on Report), a data centre service is provided on an enterprise basis only if both of these are true:

1. The data centre is owned or managed by a person in connection with carrying on an undertaking by that person.
2. The **sole purpose** of the data centre is to provide information technology services for that undertaking.

The threshold then depends on the answer:

| Type of site | Regulated if rated IT load is |
|---|---|
| Enterprise basis | 10 megawatts or more |
| Any other basis, such as colocation or wholesale | 1 megawatt or more |

## What is rated IT load?

Rated IT load is the maximum electrical power available for operating the relevant IT equipment housed in the data centre. It is a capacity figure, not your typical or average consumption.

Two consequences follow:

- **A half-empty hall can still count.** The threshold for a [data centre service](/glossary/data-centre-service) is based on capacity. If the power available to IT equipment is 1.5 megawatts, a colocation site would be in scope even if customers only draw 400 kilowatts today.
- **Facility power is not IT load.** Cooling, lighting and other building loads sit outside "relevant IT equipment", so total grid connection is not the right number. Document how you separate the two.

## How does the test work in practice?

These worked examples are our reading of the wording, not regulator guidance.

| Scenario | Likely basis | In scope on load alone? |
|---|---|---|
| A retailer's own 5 MW facility used only for its own systems | Enterprise | No, below 10 MW |
| A manufacturer's own 12 MW facility used only for its own systems | Enterprise | Yes |
| A 2 MW colocation site with several customers | Not enterprise | Yes |
| A company's 5 MW facility that also rents a few racks to one outside customer | Probably not enterprise, because IT services for itself would no longer be the sole purpose | Probably yes |
| A university's 3 MW research computing facility used only by the university | Arguably enterprise, depending on how "undertaking" applies and any external users | Probably no |
| A 0.8 MW edge site run for several customers | Not enterprise | No, below 1 MW |

The fourth row is the one to watch. A small amount of third-party use can move a site from a 10 megawatt threshold to a 1 megawatt one.

## What are the grey areas?

"Sole purpose" is strict, and several common arrangements are not spelled out:

- **Corporate groups.** If one group company runs a data centre for its sister companies, is that one undertaking or several? The Bill does not say. Take advice if this is your structure.
- **Small amounts of third-party use.** The text has no minimum, so even a modest hosting arrangement could undermine the sole purpose argument.
- **Outsourced management.** The test refers to a site "owned or managed" in connection with the person's undertaking. If a facilities company runs your site, check who the operator is for the purposes of the Regulations.
- **Several buildings.** References to a structure include a group of structures, so a campus may be measured together.
- **Future change.** The Government's factsheet says thresholds can be adjusted over time, and clause 66 of HL Bill 62 requires a review of the regime within 12 months of Royal Assent.

Ofcom guidance may clarify some of this. Until then, record your reasoning and the facts you relied on.

## How many sites are affected?

The Government's impact assessment, published in November 2025, estimated **64 data centre operators (businesses)** in scope when the measure starts. It expected the number of regulated businesses to grow more slowly than UK capacity, because much of the growth comes from existing large operators. Most enterprise sites will fall below the 10 megawatt threshold.

## What happens if your site is in scope?

Once the provisions commence, you would become an [operator of essential services](/glossary/operator-of-essential-services) in the new data infrastructure subsector, with [Ofcom as your regulator](/guides/regulator-ofcom). That would mean:

- Providing information to Ofcom within three months.
- Risk management duties.
- 24-hour and 72-hour incident notifications for incidents with an actual or likely significant impact.
- Notifying, then updating, affected UK customers.
- Penalties of up to the greater of £17 million and 4% of turnover for the most serious failures.

Read the full picture in [UK data centre regulations](/guides/uk-data-centre-regulations) and [data centres under the Bill](/whos-affected/data-centres).

If your site falls below the thresholds, this route does not apply. You could still be reached through UK GDPR, customer contracts, or another service you provide, such as a [managed or cloud service](/guides/oes-vs-rdsp-vs-rmsp). Size is not a defence: the [small business exclusion](/guides/does-the-bill-apply-to-small-businesses) does not apply to data centres.

## How should you document your decision?

Keep a one-page record for each site:

1. The site and the legal entity that owns or manages it.
2. Rated IT load, and how you calculated it, including what you excluded as non-IT load.
3. Who the facility serves, including group companies, partners and any third parties.
4. Your conclusion: enterprise or not, and in scope or not.
5. Triggers for review, such as a new tenant, new capacity, a group reorganisation or a change of operator.
6. Who signed it off, and when.

The review triggers matter as much as the first answer. Add the record to your board's risk register so a commercial decision to host a customer gets checked against the threshold.

## Sources

- [HL Bill 62 (as amended on Report), clauses 4 and 5](https://bills.parliament.uk/publications/68323/documents/8980)
- [GOV.UK: Cyber Security and Resilience Bill factsheet on data centres](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/data-centres)
- [DSIT: Cyber Security and Resilience Bill impact assessment, November 2025](https://assets.publishing.service.gov.uk/media/690cafd3d4c5f31272d3e6b2/cyber_security_and_resilience_bill_impact_assessment.pdf)

## Frequently asked questions

### What is the difference between an enterprise and a colocation data centre?

An enterprise data centre serves only the organisation that owns or manages it. A colocation data centre rents space, power and connectivity to several customers. Under the Cyber Security and Resilience Bill, enterprise sites would be regulated from 10 megawatts of rated IT load, while colocation and other sites would be regulated from 1 megawatt.

### What is rated IT load?

The maximum electrical power available for operating the IT equipment housed in the data centre. It is a capacity figure, so a part-filled hall can still exceed the threshold. Power for cooling, lighting and other building systems is not IT equipment, so your total grid connection is not the right measure.

### Does hosting one outside customer change the test?

It may. The enterprise test requires that providing IT services for your own undertaking is the sole purpose of the site. The text has no minimum level of third-party use, so even a small hosting arrangement could mean the site is judged against the 1 megawatt threshold instead of 10 megawatts.

### Are group company data centres enterprise data centres?

The Bill does not say. The test refers to IT services for the undertaking of the person who owns or manages the site, and it is unclear whether serving sister companies counts as one undertaking. If your group runs a shared data centre between 1 and 10 megawatts, take legal advice and record your reasoning.