# Cyber Security and Resilience Bill: secondary legislation tracker — Cyber Security and Resilience Bill

> Much of the detail in the Cyber Security and Resilience Bill (CSRB) will come later, in regulations, a code of practice and regulator guidance. As at 9 November 2026 every item is still at the proposed stage: nothing has been consulted on, laid or made, because the Bill is not yet law.

Canonical page: https://cybersecurityandresiliencebill.com/guides/secondary-legislation-tracker
Updated: 2026-11-13

Status checked 13 November 2026: the Bill passed the House of Lords on 2 November 2026 and returns to the Commons, which is due to consider the Lords amendments on 24 November 2026. On 4 November 2026 the Commons extended its carry-over, so it lapses if not passed by the end of 29 April 2027. It is not yet law. References are to HL Bill 62 (as amended on Report), so wording and numbering may still change in the final Act. This guide is general information, not legal advice.

## Key points

- Every item is at the proposed stage as at 9 November 2026; no consultation or draft regulations have been published.
- Commencement regulations under clause 69 will start registration, incident reporting and Part 4 directions; no dates have been set.
- The Government plans four agentic AI measures under clauses 29 and 32, after consultation and approval by both Houses.
- A voluntary near-miss reporting mechanism was promised in the Lords on 26 October 2026, with no detail yet.
- The clause 66 review and clause 67 register are Lords defeats awaiting the Commons response.

## Why does secondary legislation matter?

Much of what you will have to do under the Cyber Security and Resilience Bill (CSRB) will be set later, in [secondary legislation](/glossary/secondary-legislation) such as regulations, a code of practice and regulator guidance. As at 9 November 2026, every item on this tracker is at the "proposed" stage: none has been consulted on, laid or made, because the Bill is not yet law.

> **Position (13 November 2026):** The Bill has passed both Houses and is back in the Commons for consideration of Lords amendments. That stage is scheduled for 24 November 2026. On 4 November 2026 the Commons moved the Bill's lapse date to the end of 29 April 2027. The Bill has not received Royal Assent, so none of the powers below can yet be used.

Clause numbers are from HL Bill 62 (as amended on Report) and may change in the Act. **Last checked: 9 November 2026**, against HL Bill 62, the GOV.UK factsheets (updated 3 November 2026), Lords Hansard and legislation.gov.uk.

## How to read the status column

Each item moves through up to five stages. We record the latest stage reached, the source and the date.

| Status | Meaning |
|---|---|
| **Proposed** | The power exists in the Bill, or the Government has said it intends to use it, but nothing has been published for consultation |
| **Consulting** | A consultation or draft has been published on GOV.UK or by a regulator |
| **Laid** | A draft or made statutory instrument has been laid before Parliament |
| **Made** | The instrument has been approved (if needed) and signed, and appears on legislation.gov.uk |
| **In force** | The provisions apply |

## Live status tracker: the items most organisations need

| Item | Power (HL Bill 62) | What it would do | Status | Source and date |
|---|---|---|---|---|
| Commencement regulations | cl 69(3), (4) | Start everything not switched on at Royal Assent or two months later, including all of Part 2 (data centres, RMSPs, critical suppliers, incident reporting, penalties) and all of Part 4. Different days can be set for different purposes | **Proposed.** No draft. No dates set | HL Bill 62 cl 69; [Summary of the Bill factsheet](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/summary-of-the-bill), 3 Nov 2026 |
| Transitional and saving provision | cl 69(7) | Any grace period or transitional rule on commencement | **Proposed.** The Government says "A business adjustment period will be communicated prior to new or updated duties coming into force" | Summary factsheet, 3 Nov 2026 |
| Implementation consultation | cl 43 consultation duty | The Government's wider consultation on implementation and the content of secondary legislation | **Proposed.** "We intend to consult on implementation proposals in 2026." Not published as at 9 Nov 2026 | Summary factsheet, 3 Nov 2026; GOV.UK search, 9 Nov 2026 |
| Incident reporting thresholds | cl 29(1) regulations | Supplementary thresholds for when an incident is "significant" and reportable | **Proposed.** The Government "intends to introduce supplementary thresholds ... in secondary legislation", after consultation | [Incident reporting factsheet](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/incident-reporting), 3 Nov 2026 |
| Supply chain risk duties | cl 29(1), cl 30 | Duties on regulated entities to manage supply chain cyber risks, such as contractual requirements, security checks or continuity plans | **Proposed.** Government "committed to clarify" these in secondary legislation, subject to consultation | [Futureproofing factsheet](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/futureproofing), 3 Nov 2026 |
| Agentic AI resilience measures | cl 29(1), cl 32 | Four measures: security requirements for AI agent loss of control, affected party notification, evidence preservation and ministerial post-incident reviews. "AI agent" and "loss of oversight or control" to be defined (cl 32(2)) | **Proposed.** Government "intends to introduce four measures ... following consultation". No consultation published. Affirmative procedure | [Agentic AI factsheet](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/agentic-ai-resilience-measures), 3 Nov 2026. See [our explainer](/blog/cyber-security-resilience-bill-agentic-ai-resilience-measures) |
| Voluntary near-miss reporting mechanism | Ministerial commitment, no regulations needed | Voluntary reporting of near misses by all regulated entities, replacing the dropped mandatory duty for data centres | **Proposed.** Committed by the minister; no detail or timetable published | [Lords Hansard, 26 Oct 2026](https://hansard.parliament.uk/Lords/2026-10-26/debates/B413EFAE-E7D4-4742-986D-092884E0D8D1/CyberSecurityAndResilience(NetworkAndInformationSystems)Bill#contribution-6999C603-E82F-4C35-B57C-966A54D86F9F) |
| Code of practice | clauses 37 to 40 | Recommended measures for compliance with Part 3 requirements | **Proposed.** Not published | HL Bill 62 |
| Regulator form and manner for 24h and 72h notifications | regs 11, 11A, 12A, 14E (as substituted by cl 15) | How notifications must be sent | **Proposed.** Not published for the new duties | HL Bill 62 cl 15 |

## Lords additions and ministerial commitments with deadlines

These were added or promised during the Lords stages. The two clauses are Government defeats, so the Commons may remove or change them.

| Item | Provision | What it requires | Deadline | Status | Source and date |
|---|---|---|---|---|---|
| Review of the NIS regime | cl 66 | Review of the effectiveness of the Act and the NIS Regulations, covering scope (including cloud, SaaS, CDNs, frontier AI and democratic processes), supply chains, regulators, AISI powers, skills and incident-reporting timelines. Report to Parliament, then reviews at least every 12 months | Within 12 months of Royal Assent | **Proposed.** In HL Bill 62 after a Government defeat (202 to 155). Commons response pending | [Lords division 3730](https://votes.parliament.uk/votes/lords/division/3730), 26 Oct 2026; Bills API stages, 9 Nov 2026 |
| Register of foreign powers | cl 67 | Regulations establishing a register of foreign powers that present a risk to UK critical systems, then a report to Parliament within six months of the register being set up | Regulations within six months of Royal Assent; draft affirmative | **Proposed.** In HL Bill 62 after a Government defeat (194 to 155). Commons response pending | [Lords division 3731](https://votes.parliament.uk/votes/lords/division/3731), 26 Oct 2026; Bills API stages, 9 Nov 2026 |
| Statement on bringing further CNI into scope | Ministerial commitment | The Secretary of State will lay a Statement on whether further critical national infrastructure activities, "including, for instance, government and the food sector", should come into scope | Within 12 months of the Bill passing | **Proposed.** Commitment offered as an alternative to amendment 163 | [Lords Hansard, 26 Oct 2026](https://hansard.parliament.uk/Lords/2026-10-26/debates/B413EFAE-E7D4-4742-986D-092884E0D8D1/CyberSecurityAndResilience(NetworkAndInformationSystems)Bill#contribution-98BEC910-6968-4492-932B-2CED81FD031D) |

**A commencement wrinkle.** Clauses 66 and 67 sit in Part 4. Under clause 69 of HL Bill 62, Part 4 commences only by regulations, yet both clauses set deadlines that run from "the day on which this Act is passed". Clause 69 was not amended to list them. Watch whether the Commons stage addresses this.

## What else is switched on without new regulations?

Some provisions need no commencement regulations. They take effect automatically once the Bill is an Act.

| Provision | When it takes effect | Status | Source |
|---|---|---|---|
| Part 1; Chapters 1, 3 and 6 of Part 3 (including the cl 29 regulation-making power, cl 32 AI-agent functions and cl 33 penalties); cl 41 (report on NIS legislation at least every three years); Part 5 | On Royal Assent | **Proposed.** No Royal Assent date | HL Bill 62 cl 69(1) |
| cl 18(3) and (4) (information sharing); Chapter 2 of Part 3 (statement of strategic priorities); Sch 2 paras 3, 4 and 15 | Two months after Royal Assent | **Proposed.** No Royal Assent date | HL Bill 62 cl 69(2) |

## Which regulation-making powers should you watch?

These are the regulation-making powers in HL Bill 62 that matter most to organisations. All are at the **proposed** stage: none has been used. "Affirmative" means both Houses must approve a draft. "Negative" means the regulations take effect unless either House annuls them.

### Commencement and transition

| Power | What it does | Procedure | Why it matters |
|---|---|---|---|
| cl 69(3) | Sets the start date for everything not switched on at Royal Assent or two months later | Commencement regulations (no Parliamentary procedure stated in cl 69) | Starts your registration deadline and the 24-hour reporting clock |
| cl 69(4) | Allows different start dates for different purposes | As above | Registration and reporting may start on different days |
| cl 69(5) | Ties clause 12 (critical suppliers) to the first clause 29 regulations on activity-critical supplies | As above | Critical supplier designation cannot start on its own |
| cl 69(7) | Transitional and saving provision | As above | Any grace period will appear here, if there is one |

### Part 3: the new regulation-making framework

| Power | What it does | Procedure (cl 43) | Why it matters |
|---|---|---|---|
| cl 24(3) | Specifies "essential activities" | Consultation; affirmative | Can bring new activities into the framework. All existing NIS essential services already count |
| cl 24(6) | Designates "regulatory authorities" | Consultation; affirmative | Could add regulators |
| cl 29(1) | Regulations on security and resilience, including requirements on regulated persons (cl 30), regulator functions (cl 31) and cost recovery (cl 35) | Consultation and affirmative for most content | The main route for detailed duties |
| cl 32(1), (2) | Functions for the Secretary of State on AI agent loss of control; defines "AI agent" and "loss of oversight or control" | Consultation; affirmative | The basis for the agentic AI measures. See [AI and the Bill](/guides/ai-and-the-bill) |
| cl 33(5) | Uprates Part 3 penalty amounts for inflation | Negative | Maximum fines could rise |
| cl 41(5) | Adds matters to the Government's three-yearly report on the legislation | Consultation; affirmative | Affects what the Government must report on |

### Part 4: national security directions

| Power | What it does | Procedure | Why it matters |
|---|---|---|---|
| cl 44(1)(a) | Specifies who can receive a vendor-related direction | Consultation; affirmative | Decides whether you can be directed to stop using a supplier. See [vendor direction powers](/guides/vendor-direction-powers) |
| cl 46 | Time frame for deciding whether to give a vendor-related direction, including extensions and pauses | Negative | Affects how long a procurement can be held up |
| cl 47 | Sets up a mandatory referral scheme for "qualifying transactions" | Affirmative | Could require you to refer certain purchases to the Secretary of State before going ahead |
| cl 48(2)(b) | Specifies who can receive a general national security direction | Affirmative | Extends the reach of [national security directions](/guides/national-security-directions) |
| cl 54(5) | Defines "undertaking" and how turnover is calculated for Part 4 penalties | Negative | Decides how large a percentage-based fine can be |
| cl 54(7) | Uprates Part 4 penalty amounts for inflation | Negative | Maximum fines could rise |

## What other documents should you watch?

| Item | Power | Who decides | What it covers | Status |
|---|---|---|---|---|
| Statement of strategic priorities | clauses 25 to 27 | Secretary of State, after consultation and Parliament | Government priorities and objectives for regulators | **Proposed.** Power starts two months after Royal Assent. See [statement of strategic priorities](/guides/statement-of-strategic-priorities) |
| Regulator guidance | cl 19 | Each regulator | Security measures and incident duties | **Proposed.** Not found for the new duties |
| Information Commission guidance for RMSPs | reg 14B(3) | Information Commission | Security measures RMSPs must have regard to | **Proposed.** Not found |
| Charging schemes | cl 17 (reg 20A) and cl 35 | Each regulator | Periodic charges on regulated organisations | **Proposed.** Not found. See [cost recovery](/cost-recovery) |

## Which ones matter most for you?

The answer depends on your category, but four items matter to almost everyone:

1. **[Commencement](/glossary/commencement) regulations under clause 69.** They start your [registration](/guides/how-to-register) and reporting deadlines.
2. **Clause 29 regulations.** They can turn broad duties into specific requirements and penalties, including supply chain and agentic AI requirements.
3. **Your regulator's form and manner for notifications.** Until then, treat any [24-hour](/guides/24-hour-incident-notification-template) or [72-hour template](/guides/72-hour-incident-report-template) as a draft.
4. **The code of practice.** Read clause 39, or its renumbered section in the final Act, to see the code's legal effect before building a policy around it.

If you buy significant technology from overseas vendors, also watch clauses 44, 46 and 47.

## How will you know when something moves?

Clause 43 requires consultation before the most significant regulations are made, and clause 43(3) allows consultation carried out before Royal Assent to count. So a consultation could appear before the Bill is law.

- **Watch GOV.UK** for consultations from the Department for Digital, Culture, Media and Sport (DCMS), which GOV.UK now lists first on the Bill's material after DSIT closed on 2 November 2026, and the [Bill factsheets](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets).
- **Watch your regulator.** Ofcom regulates data centres, and the [Information Commission](/guides/regulator-information-commission) regulates RDSPs and RMSPs. See [which regulator covers you](/guides/which-regulator-covers-you).
- **Watch legislation.gov.uk** for statutory instruments made under the Act once passed.
- **Watch the Commons stage.** Our [Lords amendments tracker](/guides/what-parliament-changed) records whether clauses 66 and 67 survive.

## What can you do before the detail arrives?

You do not need the regulations to start. Registration details, risk management, 24-hour and 72-hour reporting, customer notification and customer updates are all set out in the Bill's text. Prepare those first, and keep templates, evidence formats and budget assumptions easy to change.

## Sources

- [HL Bill 62, as amended on Report, 26 October 2026](https://bills-api.parliament.uk/api/v1/Publications/68323/Documents/8980/Download), clauses 15, 24 to 47, 54 and 66 to 69
- GOV.UK factsheets, updated 3 November 2026: [Summary of the Bill](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/summary-of-the-bill), [Incident reporting](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/incident-reporting), [Futureproofing](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/futureproofing), [Agentic AI resilience measures](https://www.gov.uk/government/publications/cyber-security-and-resilience-network-and-information-systems-bill-factsheets/agentic-ai-resilience-measures)
- [Lords Report Stage, Hansard, 26 October 2026](https://hansard.parliament.uk/Lords/2026-10-26/debates/B413EFAE-E7D4-4742-986D-092884E0D8D1/CyberSecurityAndResilience(NetworkAndInformationSystems)Bill)
- Lords divisions [3730](https://votes.parliament.uk/votes/lords/division/3730) and [3731](https://votes.parliament.uk/votes/lords/division/3731), 26 October 2026
- [Bill stages, Bills API](https://bills-api.parliament.uk/api/v1/Bills/4035/Stages?take=60), checked 9 November 2026
- [Commons carry-over extension, Hansard, 4 November 2026](https://hansard.parliament.uk/Commons/2026-11-04/debates/0F7D1C34-C9B9-423F-91DC-7C49D72E63C9/CyberSecurityAndResilience(NetworkAndInformationSystems)Bill(Carry-OverExtension))
- [Cyber Security and Resilience Bill collection, GOV.UK](https://www.gov.uk/government/collections/cyber-security-and-resilience-bill)

## Frequently asked questions

### Has any secondary legislation under the Bill been published?

No. As at 9 November 2026 no consultation, draft regulations or made regulations had been published. The Bill has not received Royal Assent. Clause 43(3) of HL Bill 62 allows consultation carried out before commencement to count, so consultations from the Department for Digital, Culture, Media and Sport (DCMS), which GOV.UK now lists first on the Bill's material after DSIT closed on 2 November 2026, could appear before the Bill is law.

### When will commencement regulations be made?

No date has been set. Under clause 69 of HL Bill 62, some provisions start on Royal Assent and some two months later, but all of Part 2 (including data centres, RMSPs, critical suppliers and incident reporting) and all of Part 4 start only when the Secretary of State makes commencement regulations. The Government says a business adjustment period will be communicated first.

### What is the agentic AI consultation?

The Government said on 3 November 2026 that it will consult on four measures for AI agent loss of control incidents: security requirements, affected party notification, evidence preservation and ministerial post-incident reviews. They would be made under clauses 29 and 32 using the affirmative procedure. No consultation had been published as at 9 November 2026.

### Is there a voluntary near-miss reporting scheme?

Not yet. On 26 October 2026 the minister, Baroness Lloyd of Effra, committed to a voluntary near-miss reporting mechanism for all regulated entities, after mandatory near-miss reporting for data centres was removed. She said it needs no primary legislation. No detail or timetable has been published.

### What is the mandatory referral scheme?

Clause 47 of HL Bill 62 lets the Secretary of State set up, by affirmative regulations, a scheme requiring certain organisations to refer 'qualifying transactions' so the Secretary of State can decide whether to give a vendor-related direction. It can only be set up if necessary or expedient for national security. No scheme has been proposed.