Ofgem, GEMA and the Cyber Security and Resilience Bill

Energy is already regulated under the NIS Regulations 2018, mainly by the Energy Secretary and GEMA jointly, with Ofgem assessing operators against the Cyber Assessment Framework. The Cyber Security and Resilience Bill (CSRB) would add load controllers with 300 MW of potential control used for system-balancing.

Last updated · Precursor Security
Where this stands

Status checked : the Bill passed the House of Lords on 2 November 2026 and returns to the Commons to consider Lords amendments (no date set). On 4 November 2026 the Commons extended its carry-over, so it lapses if not passed by the end of 29 April 2027. It is not yet law. References are to HL Bill 62 (as amended on Report), so wording and numbering may still change in the final Act. This guide is general information, not legal advice.

Key points

  • Electricity and most gas services are regulated by the Energy Secretary and GEMA jointly; oil by the Energy Secretary.
  • Load controllers would be caught at 300 MW only if they act for system-balancing purposes.
  • Ofgem assesses downstream operators against CAF baseline and enhanced profiles.
  • Under the Bill, operators would face 24-hour reporting and new significance factors covering users' systems and the wider economy.

Who regulates energy under the Bill?

Mostly the Energy Secretary and the Gas and Electricity Markets Authority (GEMA), jointly, with Ofgem doing the operational work. The Cyber Security and Resilience Bill (CSRB), as amended on Report in the Lords (HL Bill 62), keeps the split in Schedule 1 of the NIS Regulations 2018 and adds a new essential service of load control.

Subsector Great Britain Northern Ireland
Electricity, including load control Energy Secretary and GEMA, jointly Department of Finance
Gas Energy Secretary and GEMA jointly, except specified services for the Energy Secretary alone Department of Finance
Oil Energy Secretary Department of Finance

GEMA is the authority; Ofgem is the office that supports it. In practice, operators deal with Ofgem's cyber team for downstream gas and electricity, and with the Department for Energy Security and Net Zero (DESNZ) for oil and upstream gas.

What are the main thresholds?

Service Threshold in Great Britain
Electricity supply More than 250,000 final customers, or a supplier also generating with 2 GW or more of capacity
Electricity transmission and distribution Could disrupt supply to more than 250,000 customers
Interconnector 1 GW or more capacity
Gas supply More than 250,000 final customers
Gas storage and LNG Can input over 20 million cubic metres a day
Load control (added by the Bill) 300 MW or more of potential electrical control, for system-balancing purposes

Northern Ireland thresholds are often far lower. See devolved nations and Schedule 2 thresholds.

How does the new load control duty work?

Clause 6 of HL Bill 62 makes load control an essential service. A load controller would be in scope if it:

  • carries on activities for system-balancing purposes, meaning balancing, flexibility, security or stability of the electricity system as a whole or a significant part of it; and
  • has potential electrical control of 300 MW or more over relevant energy smart appliances: EVs, charge points, electric heating, batteries and similar appliances.

Potential electrical control adds together the maximum flow into and out of all the appliances that can be achieved in response to the controller's signals. The system-balancing condition was added in Grand Committee. A business that sends signals only for its own customers' convenience, not to balance the system, should check whether it is caught. See load controllers explained.

DESNZ, Ofgem and the NCSC consulted from June to September 2026 on a Tier 1 Cyber Assessment Framework profile for large load controllers. The consultation proposes that Ofgem would assure in-scope controllers after a transition period. A law firm summary of the Government's impact assessment puts one-off costs at roughly £110,000 to £130,000 per controller.

How does Ofgem assess existing operators?

Against the NCSC Cyber Assessment Framework, with energy-specific profiles:

Ofgem document What it is
NIS guidance for downstream gas and electricity operators, version 3.0 Published January 2026; includes a part on the CAF
NIS supplementary guidance and CAF overlay for the downstream sector Sector overlay on the CAF
Security assurance guidance (concept) Version 1.0, April 2025

Ofgem uses a baseline profile and an enhanced profile, which is more demanding, including on supply chain risk. Which applies depends on how critical the operator is. DESNZ and Ofgem have also consulted in 2026 on reshaping cyber regulation in downstream gas and electricity, including baseline requirements for all Ofgem licensees and changes for the most critical operators, using powers in the Bill once enacted.

What changes for existing energy operators?

Change What it means
Faster reporting Initial notification within 24 hours and full notification within 72 hours of first awareness, copied to the CSIRT
Wider significance factors A Government amendment on Report added impact on users' systems and on the economy or day-to-day functioning of society to the OES factors
Incident definition An incident would need an actual adverse effect on operation or security (the current definition covers security only); near-miss wording proposed earlier in the Bill was dropped at Report
Supply chain Regulators could designate hard-to-replace direct suppliers as critical suppliers
Costs Regulators could recover costs through broader charging schemes

See what counts as a significant incident.

What should energy operators do now?

  1. Confirm which authority covers each licensed activity.
  2. Re-check any growth, acquisition or new product that could cross a threshold.
  3. If you manage smart appliances, decide whether you act for system-balancing purposes, then calculate potential electrical control using manufacturer ratings.
  4. Map your CAF profile and close gaps against the enhanced profile if it applies to you.
  5. Update incident plans for the 24-hour and 72-hour timelines and the new factors.
  6. Rank suppliers by how hard they would be to replace.

Sources

Frequently asked questions

Strictly, the designated competent authority for electricity and most gas services in Great Britain is the Energy Secretary and GEMA acting jointly. Ofgem is the office that supports GEMA and carries out the cyber oversight work for downstream gas and electricity. Oil and some gas services sit with the Energy Secretary alone.

Load control would be added to the electricity subsector, so on our reading the electricity authorities oversee it. The DESNZ consultation on a Tier 1 Cyber Assessment Framework profile proposes that Ofgem would assure in-scope controllers after a transition period. Final arrangements depend on the consultation outcome.

In HL Bill 62 a load controller is only in scope at 300 MW if it carries on activities for system-balancing purposes, meaning contributing to the balancing, flexibility, security or stability of the electricity system. The condition was added in Grand Committee. A controller not acting for those purposes is not caught by this threshold.

Ofgem uses an energy-sector baseline profile and a more demanding enhanced profile, applied according to how critical the operator is. Its NIS guidance for downstream operators, version 3.0, published in January 2026, explains the approach. Check with Ofgem which profile applies to you.