Load controllers explained

Under the Cyber Security and Resilience Bill (CSRB), a load controller is an organisation that sends signals changing electricity flows into or out of energy smart appliances such as EV chargers and heat pumps. It would be regulated if it works for system-balancing purposes and its potential control reaches 300 megawatts. The Government's impact assessment estimated about 11 in scope.

Last updated · Precursor Security
Where this stands

Status checked : the Bill passed the House of Lords on 2 November 2026 and returns to the Commons to consider Lords amendments (no date set). On 4 November 2026 the Commons extended its carry-over, so it lapses if not passed by the end of 29 April 2027. It is not yet law. References are to HL Bill 62 (as amended on Report), so wording and numbering may still change in the final Act. This guide is general information, not legal advice.

Key points

  • Under the Bill, a load controller is an organisation, not a device.
  • It would be regulated if it acts for system-balancing purposes and its potential electrical control reaches 300 MW.
  • Potential control adds maximum flows into and out of managed appliances, using manufacturer ratings.
  • The Government estimated 8 to 22 organisations in scope, with 11 in its central scenario.
  • A separate Ofgem load control licence is planned to open for applications from March 2027.

Which "load controller" do you mean?

The term has two meanings. Electrical and building equipment suppliers use it for a physical device that switches circuits or manages a load. The Cyber Security and Resilience Bill (CSRB) means something else: a person or organisation that provides the service of load control.

A household device does not become regulated under the Bill just because it controls power use. The company that sends signals to thousands of those devices might.

What does load control mean?

The Bill borrows the definitions of "load control" and "load control signal" from Part 9 of the Energy Act 2023 (section 238). In plain terms, a load controller sends signals that change how much electricity flows into or out of energy smart appliances. Examples include a business that shifts EV charging or heat pump use away from peak times, or dispatches home batteries as a virtual power plant.

Why the Bill cares: a compromised platform controlling many devices at once could switch them simultaneously and cause a sudden swing in demand. That is a grid stability risk, not merely an IT risk.

When is a load controller regulated?

A load controller would become an operator of essential services if it carries on activities for system-balancing purposes and its potential electrical control over the relevant appliances it manages is 300 megawatts or more. Both tests are in new paragraph 1(5A) of Schedule 2 to the NIS Regulations, inserted by clause 6 of HL Bill 62 (as amended on Report).

The system-balancing test was added during the Bill's passage. An activity counts if it is carried on with a view to contributing to the balancing, flexibility, security or stability of the electricity system as a whole or a significant part of it. It does not matter whether the controller also does other things.

How is potential electrical control calculated?

Potential electrical control adds together:

  • the maximum flow of electricity into all the relevant appliances you manage, taken together, and
  • the maximum flow out of them, taken together,

that can be achieved in response to your load control signals. Each appliance's maximum comes from the electrical capacity stated by its manufacturer.

A simplified worked example, using illustrative figures rather than real product specifications:

Fleet Devices Manufacturer rating per device Into Out of
Home EV chargers 30,000 7 kW import 210 MW 0
Home batteries 10,000 5 kW import, 5 kW export 50 MW 50 MW
Total potential electrical control 310 MW

This fleet crosses 300 megawatts even though, on a normal evening, it might only shift a fraction of that. Two-way devices count in both directions.

Which appliances count?

Only relevant energy smart appliances count towards the threshold. The Bill defines a "relevant ESA" as an energy smart appliance (as defined by section 238(2) of the Energy Act 2023) that is one of five types, listed in new paragraph 1(5C)(b) of Schedule 2 to the NIS Regulations (clause 6 of HL Bill 62). Section 238(2) supplies the general definition of an energy smart appliance; the list of five comes from the Bill:

  • Electric vehicles
  • Charge points for electric vehicles
  • Electrical heating appliances: hydronic, hot water and hybrid heat pumps, direct electric hot water cylinders, electric storage heaters and heat batteries (as defined in paragraph 1(8) of Schedule 2, as amended by clause 6)
  • Battery energy storage systems
  • Virtual power plants

An appliance must also be managed by you, meaning you control its flow of electricity through load control signals.

How are intermediaries treated?

Many platforms work through partners, so the Bill deals with them directly.

Arrangement Who counts as managing the appliance
Intermediary simply passes on your signals, acting for you You only
Intermediary can adjust or process signals, and you authorise it to Both you and the intermediary, which is also treated as a load controller

A company below 300 megawatts on its own account should still look at how signals reach devices and which partners have discretion over them.

How many organisations are likely to be caught?

Not many at first. The Government's impact assessment (November 2025) expected 8 organisations in scope in a low scenario, 11 in its central scenario and 22 in a high scenario in the first year. It noted five known load aggregators already controlling more than 300 megawatts, and expected the number of large load controllers to grow as smart tariffs and devices spread.

Who regulates them, and what must they do?

Load control sits in the electricity subsector (see utilities and energy). Its competent authorities are the Secretary of State for Energy Security and Net Zero and the Gas and Electricity Markets Authority (GEMA), acting jointly. Regulated controllers would have operator of essential services duties: security measures, an initial incident notification within 24 hours and a full notification within 72 hours of first becoming aware, copied to the CSIRT, plus information requests and inspections. See Ofgem, GEMA and the Bill and large load controllers.

How does this fit with the load control licence?

There is a separate energy licence, and the two are designed to join up. Ofgem's decision of 7 August 2026 on implementing the load control licensing regime set out the plan:

Milestone Planned timing
DESNZ secondary legislation on licence conditions Autumn 2026
Ofgem starts accepting licence applications Intended from 1 March 2027
Existing operators encouraged to apply Within three months of applications opening
12-month transition period, during which unlicensed activity is not an offence From when applications open
Licence becomes legally enforceable Around March 2028, after the transition

The cyber rules are tiered. DESNZ is developing two Cyber Assessment Framework profiles: Tier 1 for load controllers at 300 megawatts or more and Tier 2 for those below. Ofgem says controllers at or above 300 megawatts are expected to be designated as operators of essential services after receiving a licence, at which point NIS requirements supersede the cyber conditions in the licence. Smaller controllers stay under the licence's cyber conditions unless separately designated.

So being licensed does not by itself make you an operator of essential services, and the licence will reach controllers well below 300 megawatts. These dates depend on secondary legislation, so check the latest Ofgem and DESNZ publications.

What should a growing platform check?

  • What is our potential electrical control today, and what will it be in 12 months?
  • Do we carry on activities for system-balancing purposes, such as flexibility or balancing services?
  • Could a single credential, API key or update reach most of our fleet?
  • Which partners can adjust signals?
  • Who decides whether an incident is reportable, and can they do it within 24 hours?
  • Are we tracking both the licence timetable and the Bill?

The CAF self-assessment guide is a useful starting point, given that both regimes are expected to use CAF profiles. See also OES vs RDSP vs RMSP for how load controllers fit among the other categories.

Sources

Frequently asked questions

Under the Bill, a load controller would become an operator of essential services if it carries on activities for system-balancing purposes and its potential electrical control over relevant energy smart appliances is 300 megawatts or more. Potential control adds the maximum flows into and out of all the appliances it manages, based on the manufacturers’ stated capacities.

Not under the Bill. In electrical engineering the term often means a switching device, but the Bill uses it for a person or organisation that provides the service of load control, as defined in the Energy Act 2023. The regulated party is the company sending load control signals to devices, not the devices themselves.

Sometimes. An intermediary that only passes on a load controller’s signals is not treated as managing the appliances. If it can adjust or process the signals and is authorised to do so, the appliances count as managed by both, and the intermediary is also treated as a load controller for the threshold.

No. The Ofgem load control licence is a separate energy regime. Ofgem plans to accept applications from March 2027, with a 12-month transition before the licence is enforceable. Controllers of 300 megawatts or more are expected to be designated as operators of essential services, at which point NIS cyber requirements replace the licence’s cyber conditions.

The Secretary of State for Energy Security and Net Zero and the Gas and Electricity Markets Authority, acting jointly, as competent authorities for the electricity subsector. Regulated controllers would have to meet operator of essential services duties, including security measures and notifying significant incidents within 24 and 72 hours, copied to the CSIRT.

Get ready

Know where you stand before the duties land.

Take the free readiness assessment to see how your organisation measures up against the Cyber Security and Resilience Bill, or talk to our team about a plan.